top of page

Time for a new Construction Update at Village South

Writer: Steve Slavin
Steve Slavin
8 hours ago
1 min read


So much is happening at one time. The Townhome model (Unit 101) is about ready to be finished, cleaned, and staged. Then the courtyard villas are now painted on the outside, with work continuing inside. Sidewalks are in, the gazebo is starting construction, paving is done, and the lovely center yard is taking shape. We're excited to be so close to revealing this to the public.


For more information, just give me a call. Steve Slavin, Coldwell Banker Real Estate Group. c: 317.701.5006.

 
 
 

Comments


bottom of page